Canadian Champion (Milton, ON), 1 Apr 2010, p. 39

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

A sato h Reion z Municipal Class Environmental Assessment for Mid Halton Wastewater Treatment Plant Phase IV & V Expansion and Trunk Sewer from Boyne Pumping Station to Dundas Street (Regional Road 5)/Third [ne, Town of Milton/Town of Oakville PR-2583A and PR-2584A Background Haltos Region has completed the 2008 South Halton Water and Wastewater Master Plan Update. This Master Plan Update identified the need ta expand the Mid Halton Wastewater Treatment Plant and ta construct a new trunk sewer from Boyne Pumping Station ta Oundas Street/ ,nt *00"! Third Line ta support Regional growth ta the year 2021 (refer to, map for Study Areas). Separate studies were conducted for both of these projects in accordance with Schedule C of the Municipal Clans Envirosment Asseosment Document (October 2000 as amended in 2007), which s approved under the Ontario Environment Assessment Act. y The Process MdHfo As a part of the Environmental Assessment (EA) studies, Public Information Centre (PIC) meetings were held on May 14, 2009 and October WT 1, 2009. The first PIC outlined the background information, proposed a decision making approach, presented a long list of alternatives, as vieil as screevivg criteria, and the detailed evaluation criteria. The second PIC recommevded preferred design alternatives identified through the screenivg and detailed evaluation processes. Based on ivput received at these PICs as well as input from review agencies and other key stakeholders, the Region and ils consultants have prepared the Envirosmental Study Report (ESR) for each af these projects, Environmental Study Report <ESR) By this Notice, the ESR la being placed on the public record for review in accordance with the requirement of the Municipal Clas Envirosmental Asseasment procesa. Subject ta commenta received as a resît of this Notice and the receipt of ail necessary approvals, Halton Region intends ta proceed with the detailed design and construction as documented in the ESR. Thue Mid Halton WWTlP Phase IV & V Expansion ESR la available for public revies tarting April 19, 2010 until May 19,2010, at the following locations: Regional Municipality of Hafton Citizen's Reference Library 1151 Bronte Raad Monday - Friday: 8:30 arn. ta 4:30 p.m. Town of OakviIle Clerk's Department 1225 Trafalgar Raad Oakville, ON, [6J 5A6 Manday - Friday: 8:30 arn. ta 4:30 p.m. Oakville Central Library 120 Navy Street Oakville, ON, L6J 5A15 Manday - Thursday: Friday - Saturday: 9:30 arn. ta 9:00 p.m. 9:30 arn. ta 5:00 p.m. Sunday: 1:00 p.rn. ta 5:00 p.rn. The new Trunk Sewer ESR la available for public review atarting April 19, 2010 until May 19, 2010, at the following locations: Regional Municipality of Halton Citizen's Reference Library 1151 Brante Raad Manday - Friday: 8:30 arn. ta 4:30 p.m. Town of Milton Clerk's Department 150 Mary Street Manday - Friday: 8:30 a.m. ta 4:30 p.m. Town of OakvilIe Clerk's Department 1225 Trafalgar Raad Oakville, ON, L6) 5A6 Manday - Friday: 8:30 arn. ta 4:30 p.rn. Milton Public Library (Beaty Branch) 945 Fourth Une Manday - Thursday: Friday - Saturday: 10:00 a.m. ta8:00 p.m. 10:00 ar.ta 5:00 p.m. Oakville Central Library 120 Navy Street Oakville, ON, L6J 5A65 Manday - Thursday: Friday - Saturday. 9:30 arn. ta 9:00 p.m. 9:30 arn. ta 5:00 p.rn. Sunday: 1:00 p.m. ta 5:00 p.rn. lntereated persans ahould provide written commenta regarding each proîect mithin the preacribed Review Period ta the following contact: Mickey Liu, P.Eng. Project Manager, Public Works Halton Region Phase: 905-825-60030 evt.7235 Fax: 905-825-8822 E-mail: mickey.liu@halton.ca if concerna arise duning the prescribed Reviese Period that cannot ha resolved through discussions mith Halton Region, a persan or party may request that the Minister of Envirosment make an order for the project ta comply with Part Il of the Enviroamental Assesament Act. This reqaest (cammonly referred ta as a Part Il Order) must be received within the above prescribed review period by the Minister, ai the addreas liated below and copied ta Mr Mickey Liuaut Halton Region. If no requeat is received anaorbefore May 19, 2010, the Region may proceed with detailed design and construction of the project. This Notice firat issued an April 1, 2010 Minister of Environment Envirosmental Assesament and Approvals Branch 135 St. Clair Avenue West 1 2th Floor Toronto, ON M4V 1 PS Please let us kno as sco as posil if *o Sil have an acesi.lt or acomdto Bee B SaHlo ego rmeig 115 Bro.t Road Save Onai LB 3s a. Da 31 or9582.00 a .*l Fre 1-6-4-86aTY958793 * Shitnc

Powered by / Alimenté par VITA Toolkit
Privacy Policy